Air Techniques, Inc.
Page 10
AS12, AS22, AS50, AS70,
AS12C, AS22C, & AS50C
I n t e r n a t i o n a l
POST INSTALLATION CHECK
Make Sure Everything Is Running Properly
After your
AIRSTAR
has been installed and before it is put into operation, be sure to follow
the check-out procedure detailed below:
Check that Intake Filter(s) are fully seated into the compressor head(s) and that the Tank
Outlet Valve is closed .
Turn on the electricity . Check the incoming line voltage . It should be at least 198 Volts
for the AS12INT, AS12CINT AS22INT, AS22CINT, AS50INT, AS50CINT and AS70INT .
This voltage should remain at or above this level while the
AIRSTAR
is running . If
not, install the appropriate boost transformer and check that the correct main circuit
breaker and wire size are being used .
Check pump-up and recovery times as detailed below and compare to the times in
the table .
Turn on the
AIRSTAR
’s power and determine the pump-up time from 0-115 PSI .
See the table below .
Drain the storage tank to 80 PSI and determine the recovery time from 85 to 115 PSI .
See the table below .
INSTALLATION INFORMATION
If the recovery time differ as listed above, call authorized dealer for service.
Model
Number of
Motors/Heads
Pump-up Time
0-115 PSI Maximum
Recovery Time
85-115 PSI Maximum
AS12INT &
AS12CINT
1/1
2 minutes, 55 seconds
48 seconds
AS22INT &
AS22CINT
1/2
3 minutes, 10 seconds
47 seconds
AS50INT &
AS50CINT
2/4
2 minutes, 50 seconds
42 seconds
AS70INT
3/6
2 minutes, 40 seconds
40 seconds
Содержание AirStar AS12CINT
Страница 11: ...Page 11 Air Techniques Inc AS12 AS22 AS50 AS70 AS12C AS22C AS50C Int e rna t iona l NOTES...
Страница 18: ...Air Techniques Inc Page 18 AS12 AS22 AS50 AS70 AS12C AS22C AS50C Inte rnational NOTES...
Страница 19: ...Page 19 Air Techniques Inc AS12 AS22 AS50 AS70 AS12C AS22C AS50C Int e rna t iona l NOTES...