Chapter 10 - Transporting Method
ff
M081U801
fi g. 10ff
Hoisting the machine
31
M084S120
Crane hook
More than 2.5 m
Hoisting rings
(4 rings)
Protection is
necessary
fi g. 10f3
WARNING
• Be sure the crane capacity, loading
surfaces, sling wires or chains are strong
enough to support the machine weight.
See the serial number plate for the
machine weight.
• Pass the sling chains or wire ropes
through the hoisting rings. There is the
possibility that the machine will break,
and fall. Such accidents could result in
death or serious injury.
Step 1
Use 4 sling chains or wire ropes of the
same length. (Refer to fig. 10–3 for length)
Step 2
Attach the sling chains
or wire ropes firmly,
for example, with
shackles, to all the
hoisting rings.
NOTICE
If sling chains or wire ropes contact the
platform, place pads on the platform to
protect it.
Step 3
Place the sling wires or chains according
to the fig. 10–3 and hoist the machine.
Lifting with forklift
41
If a forklift is used, there are marks
on the machine. Adjust the 2
forklift forks to the marks and
insert.
M081U701
fi g. 10ff
WARNING
Insert the forklift forks at the marks.
There is hazard of the machine falling,
and of damage to the machine. Such
accidents could result in death or
serious injury.
Содержание SV06CNL
Страница 6: ...iv This page intentionally left blank...
Страница 38: ...Chapter 12 Specifications 32 This page intentionally left blank...
Страница 39: ......
Страница 40: ......