We strongly recommend that all personnel associated with this equipment be trained in the correct operational
and safety procedures required for this product. This product has been designed and constructed according to
general engineering standards, other local regulations may apply and must be followed by the operator. Use the
sign-off sheet below to record initial and periodic reviews of this manual with all such personnel.
Date
Employee Signature
Employer Signature
Содержание WHEATHEART X130
Страница 9: ...31025 R0 9 BIN X TEND HOPPER X130 2 SAFETY...
Страница 45: ...31025 R0 45 X TEND HOPPER X130 9 APPENDIX...