
Chapter 2 — Getting to Know the DRM-100
Page 5
240VAC 50/60Hz, without need for adjustment. Do not
cover Power Entry Module with test leads or any other
object and keep it accessible.
Grounding/Earth Terminal
Metal ground/earth binding post is on the right side of
Entry Module for grounding/earth the equipment under
the test.
LCD Screen
LCD screen is installed on the middle of front panel. It
shows test conditions like current, time and measured
resistance.
Buttons
On the left side of LCD screen are 4 membrane buttons.
They are used to select the time and current settings and
to Start or Stop the test.
Item
Description
I/t Button
I/t button is used to toggle between the current
selection and time selection fields. The selected
field is highlighted with bright yellow color
Up Arrow
button
Up Arrow button is used to increment value of
selected field of current or time. The current can be
incremented in steps of 10A from 10 to 100A. The
time can be incremented from 10 to 60 seconds in
steps of 1 second.
Содержание DRM-100
Страница 1: ...User Manual Model DRM 100 Digital Resistance Meter ADWEL International Limited an IRIS Power Company...
Страница 25: ...Chapter 2 Getting to Know the DRM 100 Page 16...
Страница 35: ...Certificate Page 26 CE Declaration of Conformity Appendix B...
Страница 39: ...Appendix C Index Page 30 U Up Arrow button 5 V Voltage Receptacles 6 W Warning messages 12 14 Weight 25...