CHAPTER 3
Configuring the Gateway
110
Figure 105. SSH Tunnel - Job scheduling - Mode - Times
Job status
“Job status” allows you to check the time and the result of the last
SSH tunnel connection:
Figure 106. SSH Tunnel - Job status
•
Last run - displays the point in time when the last contact with
the SSH tunnel server took place;
•
Last result - displays the result of the establishment of the
contact;
•
Next run - displays the point in time of the planned next
establishment of contact with the SSH tunnel server.
Job dependent settings
Determine that in case of successful connection to the SSH tunnel
server, a message has to be forwarded to the address enlisted in
the tree window “Notification Sending”.
Содержание A850
Страница 92: ...CHAPTER 3 Configuring the Gateway 92 Figure 81 PPP Configuration Window ...
Страница 107: ...CHAPTER 3 107 Figure 101 SSH Tunnel Window The following window areas are available through the SSH tun nel window ...
Страница 128: ...CHAPTER 3 Configuring the Gateway 128 Figure 132 Dialup Modem Window ...
Страница 164: ...CHAPTER 3 Configuring the Gateway 164 ...
Страница 177: ...CHAPTER 4 Sensor Type Configuration 177 Figure 183 Sensor type Window Analog ...
Страница 196: ...CHAPTER 4 Using the Gateway 196 Figure 216 Sensor type Window LC ...
Страница 200: ...CHAPTER 4 Using the Gateway 200 Figure 222 Sensor type Window OC ...
Страница 204: ...CHAPTER 4 Using the Gateway 204 Figure 228 Sensor type Window SDI ...
Страница 215: ...CHAPTER 4 Logs 215 Figure 241 System Log Selection Log types Figure 242 System Log Log types ...
Страница 275: ...CHAPTER 4 RTU Network Configuration 275 Sensor details Figure 319 Sensor details Window ...
Страница 366: ...CHAPTER 6 Appendix 366 ...