There are four knockouts in both the top and bottom of the enclosure walls for one inch EMT metal conduit fittings for
wires and fiber optic cables, see
Wall-Mount Bottom View and
Wall-Mount Top View for dimensions.
and the Conduit Drawing,
, for routing. Power and ACE-to-ACE communication wiring must be in separate
conduits.Attach all conduits as required to the bottom or to the top access plate ONLY as seen in
.Protect ALL
electronic equipment in the ACE2 enclosure while installing conduit.
Figure 11: Wall-Mount, Bottom View
Figure 12: Wall-Mount, Top View
96A0357, Rev. G, 2019/11/08
21
Copyright
©
ADB Safegate, All Rights Reserved
Содержание ACE2
Страница 1: ...Advanced Control Equipment ACE2 User Manual 96A0357 Rev G 2019 11 08 ...
Страница 2: ......
Страница 6: ...Advanced Control Equipment ACE2 TABLE OF CONTENTS vi Copyright ADB Safegate All Rights Reserved ...
Страница 10: ...Advanced Control Equipment ACE2 Advanced Control Equipment 4 Copyright ADB Safegate All Rights Reserved ...
Страница 18: ...Advanced Control Equipment ACE2 Introduction 12 Copyright ADB Safegate All Rights Reserved ...
Страница 42: ...Advanced Control Equipment ACE2 Parts 36 Copyright ADB Safegate All Rights Reserved ...
Страница 46: ......