Installation & Commissioning Guide - ESP Platinum OD Split Ducted Units
Doc. Part No. 0525-053
Ver. 5 200129
Page 20 of 36
AEDC2 DATA CABLE P-CLIP SHIELDING INSTRUCTIONS
Step 1:
Step 1:
• •
Strip approximately 100mm of outer insulation off
Strip approximately 100mm of outer insulation off
AEDC2 Data cable.
AEDC2 Data cable.
• •
Unwrap the shield foil and plastic wrap around the
Unwrap the shield foil and plastic wrap around the
core wires, (See Fig. 1 below).
core wires, (See Fig. 1 below).
Step 2:
Step 2:
• • Twist the core wires together.
Twist the core wires together.
• • Remove (cut) the plastic wrap and screen
Remove (cut) the plastic wrap and screen
wires, (See Fig. 2 below).
wires, (See Fig. 2 below).
Step 3:
Step 3:
• •
Wrap shield foil around core wires as shown in
Wrap shield foil around core wires as shown in
Fig. 3 below.
Fig. 3 below.
Step 4:
Step 4:
• •
Remove metal P-Clip from the electrical panel.
Remove metal P-Clip from the electrical panel.
• •
Open up P-Clip to fit AEDC2 data cable into
Open up P-Clip to fit AEDC2 data cable into
clip. (See Fig. 4 below).
clip. (See Fig. 4 below).
Figure 1
Screen Wires
Outer Insulation
Plastic Wrap
Shield Foil
Core Wires
Figure 2
Figure 3
P-Clip
Figure 4
Содержание CRQ2-14AS
Страница 35: ...THIS PAGE IS INTENTIONALLY LEFT BLANK ...