![ACP ARX1 Скачать руководство пользователя страница 63](http://html.mh-extra.com/html/acp/arx1/arx1_service-manual_2840493063.webp)
©2018 ACP, Inc.
Cedar Rapids, IA 52404
Page 63 of 80
Part No. 16400033
Original Instructions
Secondary, Monitor and Tertiary Interlock Switches
Secondary, Monitor and Tertiary Interlock Switches
The Secondary, Monitor and Tertiary Interlock Switches are part of a redundant safety system that will turnoff the
Microwave Circuit(s) when the door is opened in case of a Primary Switch failure
Testing
Use Test Plug on top of oven
Door Closed:
VT to BU = Open (Monitor)
VT to OR = Continuity (Secondary)
Note: Primary Switch MUST actuate first when opening door.
Removal and Replacement
1 Disconnect oven from Power Supply
For Secondary and Monitor Switches
2 Remove Top and Right Side Panels
(see Panel Removal)
3 Remove 11/32” (9mm) Hex Nut securing Switch Assembly
4
Lift Bracket off Mounting Stud and slide out.
5 Remove Wires noting their locations
6 Replace with Kit (P/N 59174580)
7 Reverse these steps to complete replacement
For Tertiary Switch
1 Remove Top and Right Side Panels
2 Remove two (2) Hex Head Screws securing Tertiary Switch
3 Remove Wires noting their locations
4 Reverse these steps to complete replacement
Содержание ARX1
Страница 28: ... 2018 ACP Inc Cedar Rapids IA 52404 Page 28 of 80 Part No 16400033 Original Instructions Care and Cleaning 6 ...
Страница 77: ... 2018 ACP Inc Cedar Rapids IA 52404 Page 77 of 80 Part No 16400033 Original Instructions Notes ...
Страница 78: ... 2018 ACP Inc Cedar Rapids IA 52404 Page 78 of 80 Part No 16400033 Original Instructions Notes ...
Страница 79: ... 2018 ACP Inc Cedar Rapids IA 52404 Page 79 of 80 Part No 16400033 Original Instructions Notes ...
Страница 80: ... 2018 ACP Inc Cedar Rapids IA 52404 Page 80 of 80 Part No 16400033 Original Instructions www acpsolutions com ...