82
Installation
LipuSmart-P
3.2.3 More detailed descriptions of a selection of installation work
Position the pipe connector at the ventilation line above the gully of the grease
separator:
■
Release the clip screws and push the hose
OVERÏTHEÏCONNECTIONÏPORTÏ
z
Pull the lifting plant unit and the grease separator unit together:
■
Arrange the tension belt at the indicated
POSITIONÏ
z
ÏANDÏPULLÏTHEÏGREASEÏSEPARATORÏ
and lifting plant together.
■
!LSOÏUSEÏAÏBUOYANCYÏSAFEGUARDÏ
z
Determine the connection port for the ‘pump’ construction unit on the lifting plant
and open:
■
3ELECTÏAÏCONNECTIONÏPORTÏ
z
ÏANDÏOPENCUTÏ
along the cutting notches and remove the
burr.