105
Operation
LipuSmart-P
EN
Î
%VERYÏTIMEÏIFÏ,%$Ïh/.vÏ
ÏmASHES
3WITCHÏONÏSUCTIONÏPUMPÏSUCTIONÏVEHICLE
Î
,%$Ï/&&vÏ
shines:
3WITCHÏOFFÏSUCTIONÏPUMPÏSUCTIONÏVEHICLE
,%$Ï
ÏLIGHTSÏUPÏ$ISPOSALÏÏCLEANINGÏPROGRAMMEÏISÏlNISHED
Î
$ISCONNECTÏTHEÏSUCTIONÏHOSEÏSUCTIONÏVEHICLE ÏTOÏTHEÏDISPOSALÏLINEÏ
Î
#ONNECTÏWASTEWATERÏSUPPLYÏ ÏORÏSTARTÏCATERINGÏESTABLISHMENTÏONCEÏTHEÏlLLINGÏPROCESSÏHASÏ
been completed.
4.6 Test run lifting plant
Requirements:
Î
3HUTOFFÏVALVEÏINÏTHEÏPRESSUREÏLINEÏIFÏTHEREÏISÏONE ÏISÏOPEN
Î
The control is connected to the power supply.
$URINGÏTHEÏTRIALÏRUNÏPAYÏATTENTIONÏTOÏTHEÏFOLLOWING
Î
Perform the trial run at least twice during launch.
Î
4ESTÏRUNÏWITHÏDRINKINGÏWATER
Î
Avoid dry running during the trial run.
Î
/BSERVEÏTHEÏSIGNALSMESSAGESÏINÏTHEÏDISPLAYÏPANELÏOFÏTHEÏCONTROL
WARNING
)FÏTHEREÏAREÏKNOCKINGÏNOISESVIBRATIONSÏINÏTHEÏPRESSUREÏLINEÏWHENÏTHEÏPUMPÏISÏSWITCHEDÏ
OFFÏTHEÏSTOPÏDELAYÏPERIODÏMUSTÏBEÏINCREASEDÏINÏÏSECONDÏSTEPSÏUNTILÏTHESEÏNOÏLONGERÏOCCUR
4HEÏLIFTINGÏPLANTÏCANÏBEÏlLLEDÏVIAÏTHEÏINLETÏLINEÏORÏVIAÏTHEÏINSPECTIONÏOPENING
Start automatic mode:
Î
Press
AUTO
both
buttons to start automatic operation of pump 1 and 2.