65
*SV]SYV7EJIX]
LipuSmart-P
EN
■
/PERATINGÏLOGÏ4HEÏOPERATORÏMUSTÏKEEPÏANÏOPERATINGÏLOGÏFORÏEACHÏGREASEÏSEPARATORÏANDÏSUBMITÏ
it to the local competent inspecting authority on request. Operating logs can be purchased
FROMÏ!#/Ï3ERVICEÏ
Ï)NTRODUCTIONÏ#HAPÏÏh!#/Ï3ERVICEv
Lifting plant
■
$).Ï%.ÏÏ@7ASTEWATERÏLIFTINGÏPLANTSÏFORÏFORÏLANDÏANDÏSITEÏDRAINAGEÏ
– Part 2: Wastewater lifting plants for waste water free of faeces
■
$).Ï%.ÏÏ@7ASTEWATERÏLIFTINGÏPLANTSÏFORÏLANFÏANDÏSITEÏDRAINAGEÏ
nÏ0ARTÏÏ"ACKmOWÏVALVEÏFORÏWASTEWATERÏWITHÏANDÏWITHOUTÏFAECES
■
%.ÏÏ@'RAVITYÏDRAINAGEÏSYSTEMSÏINSIDEÏBUILDINGSÏ
– Part 1: General and execution requirements’
■
%.ÏÏ@'RAVITYÏDRAINAGEÏSYSTEMSÏINSIDEÏBUILDINGS
– Part 4: Wastewater lifting plant; planning and dimensioning
■
%.ÏÏ@'RAVITYÏDRAINAGEÏSYSTEMSÏINSIDEÏBUILDINGS
nÏ0ARTÏÏ7ASTEWATERÏLIFTINGÏPLANTÏ)NSTALLATIONÏANDÏTESTINGÏINSTRUCTIONSÏFORÏOPERATIONÏ
maintenance and use’
■
$).ÏÏ@$RAINAGEÏSYSTEMSÏFORÏBUILDINGSÏANDÏPROPERTY
nÏ0ARTÏÏ3PECIlCATIONSÏINÏCONNECTIONÏTOÏ%.ÏÏANDÏ%.Ïh
Examples from the listed standards:
■
"ACKmOWÏPROTECTIONÏ7ASTEWATERÏPRODUCEDÏBELOWÏTHEÏBACKmOWÏLEVELÏMUSTÏBEÏFEDÏINTOÏTHEÏ
drainage system via an automatic wastewater lifting plant.
■
Test run: Carry out at least 2 test runs every month
■
Maintenance: Wastewater lifting plants must be operated and maintained
ACCORDINGÏTOÏ%.ÏÏTOÏENSUREÏPROPERÏFUNCTIONINGÏANDÏOPERATINGÏSAFETYÏ
Stipulated maintenance intervals for the wastewater lifting plant according to
%.ÏÏ#OMMERCIALÏOPERATIONÏÏÏÏEVERYÏÏMONTHS