3 System upgrade
36
Warning! Failure to properly turn off the server before you
start installing components may cause serious damage. Do
not attempt the procedures described in the following
sections unless you are a qualified service technician.
Post-installation instructions
Perform the steps below after installing a server component:
1
See to it that all components are installed according to the
described step-by-step instructions.
2
Reinstall any expansion board(s) or peripheral(s) that you have
previously removed.
3
Reinstall the chassis panels.
4
Connect the necessary cables.
5
Turn on the system.
Содержание Altos G530 Series
Страница 1: ...Acer Altos G530 Series User s Guide ...
Страница 10: ...x Index 179 ...
Страница 11: ...1 System tour ...
Страница 33: ...2 System setup ...
Страница 43: ...3 System upgrade ...
Страница 87: ...4 BIOS setup ...
Страница 119: ...109 CD DVD Drives The CD DVD Drives submenu displays the type of ATAPI CD ROM installed in the system ...
Страница 131: ...5 Troubleshooting ...
Страница 153: ...Appendix A System management utility ...
Страница 160: ...Appendix A System management utility 150 ...
Страница 161: ...Appendix B Acer Altos G530 rack installation guide ...
Страница 162: ...This appendix shows you how to set up the Altos G5350 server in a rack mount configuration ...
Страница 177: ...Appendix C SATA RAID configuration ...
Страница 178: ...This appendix shows you how to create a RAID volume in your SATA drives ...
Страница 181: ...171 c Press Ctrl Alt Del to reboot the server 8 Install an Operating System to the RAID array ...
Страница 182: ...Appendix C SATA RAID configuration 172 ...
Страница 183: ...Appendix D SCSI RAID configuration ...
Страница 184: ...This appendix shows you how to create a RAID volume in your SCSI drives ...