Maintenance 7
3.2 Outdoor Unit
Evacuation for the whole system
/TJUUX[TOZ
2OW[OJYOJK
-GYYOJK
56+4
)259+
:]U]G_\GR\K
:NXKK]G_\GR\K
5[ZJUUX[TOZ
5VKT
5VKT
2U
.O
<GI[[SV[SV
Procedure:
1.
Confirm that the 2- and 3-way valves are opened.
2.
Connect the vacuum pump to the 3-way valve’s
service port.
3.
Evacuate the system for approximately one hour.
Confirm that the compound meter indicates
-0.1 MPa (14.5Psi).
4.
Close the valve (Low side) on the charge set and turn
off the vacuum pump.
5.
Wait for 5 minutes then check whether the gauge
needle moves after turning off the vacuum pump. If
the gauge needle moves backward, check whether
there is gas leakage.
6.
Disconnect the charge hose from the vacuum pump.
7.
Mount the caps of service port and 2- and 3-way
valves.
8.
Use a torque wrench to tighten the caps to a torque
of 18 N.m.
Содержание COLONNA CLN130R
Страница 2: ...R32 DC Inverter Floor standing Type Air conditioner unit SERVICE MANUAL 09 2022 MTE01004I0120 00...
Страница 3: ......
Страница 6: ......
Страница 7: ...Contents 1 Precautions 2 2 Information servicing For flammable materials 3 Safety Precautions...
Страница 13: ...Contents 1 Model Reference 2 2 Pipe Length and Drop Height 3 3 Electrical Wiring Diagrams 4 Specifications...
Страница 19: ...Specifications 7...
Страница 20: ...Outdoor unit printed circuit board diagram 17122000041841 Specifications 8...
Страница 22: ...Outdoor unit DC motor driver board diagram 17122000021912 5 6 1 2 3 4 Specifications 10...
Страница 41: ...Indoor Unit Disassembly 2 1 Dimension...
Страница 57: ...Outdoor Unit Disassembly 3 2 Dimension UECS130R...
Страница 100: ...For some models 33...