Maintenance 5
3. Re-Installation
3.1 Indoor Unit
Collecting the refrigerant into the outdoor unit
/TJUUX[TOZ
2OW[OJYOJK
-GYYOJK
)RUYK
)RUYK
:]U]G_\GR\K
:NXKK]G_\GR\K
5[ZJUUX[TOZ
5VKT
)RUYK
2U
.O
Procedure:
1.
Confirm that the 2- and 3-way valves are opened.
2.
Connect the charge hose with the push pin of Handle
Lo to the 3-way valve’s gas service port.
3.
Open the Handle Lo manifold valve to purge air
from the charge hose for 5 seconds and then close it
quickly.
4.
Close the 2-way valve.
5.
Operate the air conditioner in cooling mode. Cease
operations when the gauge reaches 0.1 MPa (14.5
Psi).
6.
Close the 3-way valve so that the gauge rests
between 0.3 MPa (43.5 Psi) and 0.5 MPa (72.5 Psi).
7.
Disconnect the charge set and mount the caps of
service port and 2- and 3-way valves.
8.
Use a torque wrench to tighten the caps to a torque
of 18 N.m.
9.
Check for gas leakage.
Содержание COLONNA CLN130R
Страница 2: ...R32 DC Inverter Floor standing Type Air conditioner unit SERVICE MANUAL 09 2022 MTE01004I0120 00...
Страница 3: ......
Страница 6: ......
Страница 7: ...Contents 1 Precautions 2 2 Information servicing For flammable materials 3 Safety Precautions...
Страница 13: ...Contents 1 Model Reference 2 2 Pipe Length and Drop Height 3 3 Electrical Wiring Diagrams 4 Specifications...
Страница 19: ...Specifications 7...
Страница 20: ...Outdoor unit printed circuit board diagram 17122000041841 Specifications 8...
Страница 22: ...Outdoor unit DC motor driver board diagram 17122000021912 5 6 1 2 3 4 Specifications 10...
Страница 41: ...Indoor Unit Disassembly 2 1 Dimension...
Страница 57: ...Outdoor Unit Disassembly 3 2 Dimension UECS130R...
Страница 100: ...For some models 33...