2.5.1.2 SOURCE 2 Priority (No generator)
The switching sequence can be
summarized in the following steps:
• An anomaly occurs on SOURCE 2
• Override momentary S2 outage delay
• Transfer from S2 to S1 delay
• Pre-transfer signal on
• Load shed signal on
• Pre-transfer S2 to S1 delay
• Load shed delay
• Transfer switch (SOURCE 2) to
position O
• Center-off delay (only with Delayed
transition I - O - II type)
• Transfer switch (SOURCE 1) to
position I
• Post-transfer S2 to S1 delay
• Pre-transfer signal off
And the re-transfer sequence can be
summarized in the following steps:
• SOURCE 2 is restored
• Transfer from S1 to S2 delay
• Pre-transfer signal on
• Pre-transfer S1 to S2 delay
• Transfer switch (SOURCE 1) to
position O
• Center-off delay (only with Delayed
transition I - O - II type)
• Transfer switch (SOURCE 2) to
position I
• Load shed signal off
• Post-transfer S1 to S2 delay
• Pre-transfer signal off
Содержание Zenith ZTG 30
Страница 2: ......
Страница 6: ...6 Zenith ZTG Series ATS OPER ATION MAINTENANCE AND INSTALL ATION GUIDE 1 ...
Страница 10: ...10 Zenith ZTG Series ATS OPER ATION MAINTENANCE AND INSTALL ATION GUIDE 1 ...
Страница 52: ...52 1 Zenith ZTG Series ATS OPER ATION MAINTENANCE AND INSTALL ATION GUIDE ...
Страница 91: ...91 1 Fig 7 3 ZTGD delayed transition circuit diagram ...
Страница 93: ...93 1 Figure A Figure B ...
Страница 94: ...94 1 Zenith ZTG Series ATS OPER ATION MAINTENANCE AND INSTALL ATION GUIDE Figure C ...
Страница 96: ...2 96 Zenith ZTG Series ATS OPER ATION MAINTENANCE AND INSTALL ATION GUIDE ...
Страница 108: ...2 108 Zenith ZTG Series ATS OPER ATION MAINTENANCE AND INSTALL ATION GUIDE ...
Страница 114: ...2 114 Zenith ZTG Series ATS OPER ATION MAINTENANCE AND INSTALL ATION GUIDE ...