29
1
No source priority (generator and load shed usage disabled)
Switch position I
Switch position O
Switch position II
SOURCE 1 OK
SOURCE 2 OK
Pre-transfer signal
Override momentary S1 outage delay
Transfer from S1 to S2 delay
Override momentary S2 outage delay
Transfer from S2 to S1 delay
Center-off delay, I - O - II
Pre-transfer S1 to S2 delay
Post-transfer S1 to S2 delay
Pre-transfer S2 to S1 delay
Post-transfer S2 to S1 delay
—
Table 2.5 Automatic Switching Sequences, No Source Priority (Generator and load shed usage disabled)
Содержание Zenith ZTG 30
Страница 2: ......
Страница 6: ...6 Zenith ZTG Series ATS OPER ATION MAINTENANCE AND INSTALL ATION GUIDE 1 ...
Страница 10: ...10 Zenith ZTG Series ATS OPER ATION MAINTENANCE AND INSTALL ATION GUIDE 1 ...
Страница 52: ...52 1 Zenith ZTG Series ATS OPER ATION MAINTENANCE AND INSTALL ATION GUIDE ...
Страница 91: ...91 1 Fig 7 3 ZTGD delayed transition circuit diagram ...
Страница 93: ...93 1 Figure A Figure B ...
Страница 94: ...94 1 Zenith ZTG Series ATS OPER ATION MAINTENANCE AND INSTALL ATION GUIDE Figure C ...
Страница 96: ...2 96 Zenith ZTG Series ATS OPER ATION MAINTENANCE AND INSTALL ATION GUIDE ...
Страница 108: ...2 108 Zenith ZTG Series ATS OPER ATION MAINTENANCE AND INSTALL ATION GUIDE ...
Страница 114: ...2 114 Zenith ZTG Series ATS OPER ATION MAINTENANCE AND INSTALL ATION GUIDE ...