
2
80
Zenith ZBTS T-series 100-1200A, I N S TA LL ATI O N A N D O PER ATI N G I N S TR U C TI O N
Ekip
3
4
1
2
—
Fig. 8.1 First step: Remove carefully the factory mounted auxiliary power supply module OXEA1 and
signal modules from the fixed Bypass switch. There is no need to remove the existing wirings.
—
Fig. 8.2 Step two: Mount the Ekip –modules to the combination of auxiliary power supply module
and signal modules, then place the entire assembly back to the fixed Bypass switch.
8.1.1 Mounting of Ekip –modules to the fixed Bypass switch
Содержание Zenith ZBTS T Series
Страница 2: ...2 Zenith ZBTS T series 100 1200A INSTALL ATION AND OPER ATING INSTRUCTION 1 ...
Страница 6: ...6 Zenith ZBTS T series 100 1200A INSTALL ATION AND OPER ATING INSTRUCTION 1 ...
Страница 10: ...10 Zenith ZBTS T series 100 1200A INSTALL ATION AND OPER ATING INSTRUCTION 1 ...
Страница 44: ...44 Zenith ZBTS T series 100 1200A INSTALL ATION AND OPER ATING INSTRUCTION 1 ...
Страница 58: ...58 Zenith ZBTS T series 100 1200A INSTALL ATION AND OPER ATING INSTRUCTION 1 ...
Страница 68: ...68 Zenith ZBTS T series 100 1200A INSTALL ATION AND OPER ATING INSTRUCTION 1 ...
Страница 100: ...2 100 Zenith ZBTS T series 100 1200A INSTALL ATION AND OPER ATING INSTRUCTION 3 ...
Страница 103: ...2 103 34ZBTS _ 30 1200A rev A 1SCC303043M0201 4 ...
Страница 105: ...2 105 34ZBTS _ 30 1200A rev A 1SCC303043M0201 4 ...
Страница 107: ...2 107 34ZBTS _ 30 1200A rev A 1SCC303043M0201 4 ...
Страница 108: ...2 108 Zenith ZBTS T series 100 1200A INSTALL ATION AND OPER ATING INSTRUCTION 4 ...
Страница 109: ...2 109 34ZBTS _ 30 1200A rev A 1SCC303043M0201 4 ...