48
Installation and commissioning guide
1ZSC000562-AAK EN, REV. 2, 2019-07-03
2.
Make sure that the flange of the oil valve fits the
tap-changer.
NOTE!
Dimensions of the O-ring (3).
G004445
3.
Install the oil valve (5), with the O-ring (3).
G004526
4.
Install the pipe (2) on the oil valve (5).
CAUTION!
Make sure that the O-ring (3) is not
damaged, and is correctly installed.
G004447
Torque
49 Nm
Содержание VUBB
Страница 14: ...14 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Страница 28: ...28 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Страница 52: ...52 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Страница 60: ...60 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Страница 68: ...68 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Страница 72: ...72 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Страница 74: ...74 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Страница 76: ...76 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...