Installation and commissioning guide
1ZSC000562-AAK EN, REV. 2, 2019-07-03
43
17.
Make sure that the axial play is less than 2 mm.
If the axial play is more than 2 mm:
1.
Loosen the hex screws (2).
2.
Move the coupling halves outwards (9).
3.
Tighten the hex screws (2).
G004396
Torque
10 Nm
18.
Move the protection tubes (8) apart, and tighten
the hose clamps (6).
CAUTION!
Make sure that there is 3 to 5 mm of
clearance between the lower protection
tube, and the horizontal surface of the
motor-drive. This clearance is
important for draining rainwater.
G004397
End of instruction
Содержание VUBB
Страница 14: ...14 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Страница 28: ...28 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Страница 52: ...52 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Страница 60: ...60 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Страница 68: ...68 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Страница 72: ...72 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Страница 74: ...74 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Страница 76: ...76 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...