2.
Measure the length (K2) between the spherical
shaft-ends.
G004391
3.
Calculate the drive shaft length and subtract 6 mm from the length K2.
Cut the drive shaft to length (K2 - 6 mm).
4.
Remove burrs and loose material from the drive shaft.
5.
Calculate the correct length (LB2) for the protection tubes, refer to the table.
Example: if the length of K2 is 390 mm, then LB2 is = (390 +210) / 2 = 600 / 2 = 300 mm.
For K2 (mm)
Calculate LB2 (mm)
200 to 290
(K2 + 180) / 2
291 to 600
(K2 + 220) / 2
Greater than 600
(K2 + 410) / 2
6.
Cut the two protection tubes at the end (1) that is
not slotted.
CAUTION!
Remove the tube end (1) that is not
slotted.
G004392
Содержание VUBB
Страница 14: ...14 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Страница 28: ...28 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Страница 52: ...52 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Страница 60: ...60 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Страница 68: ...68 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Страница 72: ...72 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Страница 74: ...74 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Страница 76: ...76 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...