![ABB UNO-DM-1.2-TL-PLUS Скачать руководство пользователя страница 99](http://html.mh-extra.com/html/abb/uno-dm-1-2-tl-plus/uno-dm-1-2-tl-plus_manual_3045417099.webp)
- 99 -
000696DG
7 - Operation
Pre-commissionig phase 2 - Internal web UI access
DEVICE USED TABLET/SMARTPHONE:
• SCAN this QR code (it is also reported in the Quick installation guide
and in the pre-commissioning flyer inside the box of the inverter).
DEVICE USED LAPTOP:
• Open an internet browser (reccomended browser: Chrome versions
from v.55, Firefox versions from v.50) and enter the pre-set IP address
192.168.117.1
to access the setup pages (web user interface).
STEP BY STEP COMMISSIONING WIZARD:
The language of the wizard could be changed by clicking on the upper status bar
STEP 1 - Administrator/User login credentials
-
Set the
Administrator
account user and pas-
sword (minimum 8 character for password):
Administrator account can open and view the contents
of photovoltaic site. Additionally, they can make changes
to inverter settings. User and password are CASE SEN-
SITIVE.
-
Set the
User
account user and (optional) pas-
sword (minimum 8 character for password):
User account can only read data. It cannot make any
changes. User and password are CASE SENSITIVE.