50
1050
50
50
600
50
700
1150
345
230
230
345
14 (4x)
243
457
50
860
140
1050
50
400
50
500
250
250
230
230
340
14 (4x)
50
400
50
50
860
50
15 (4x)
460
36
36
50
860
140
1050
50
400
50
500
250
250
230
230
340
14 (4x)
50
400
50
50
860
50
15 (4x)
460
36
36
17
D I S T R I B U T I O N S O LU T I O N S
8.5 Foundations and fixing bed
The cubicles are normally pre-engineered for
connection of the medium voltage circuit from the
bottom.
The front part of the roof of UniSec cubicles has a
duct for routing the auxiliary circuit cables. Make
the relative routing holes under each cubicle before
it is installed.
The foundation layout is shown in the figure.
The switchgear can be fastened straight to the floor
by inserting expansion plugs into the fixing holes.
The fixing surface must be horizontal and well
levelled, with 2 x 1000 flatness tolerance.
Holes in the floor for fixing the
cubicles
DY800/316
DY800/116
DY800/216
Содержание UniSec DY800
Страница 29: ...29 DISTRIBUTION SOLUTIONS Notes ...