ABB | SACE Emax 2
180 | © 2017 ABB | 1SDH001330R0002 - ECN000058721 Rev. A
Electronic accessories | 3 - Ekip Measuring modules
Measurements
The following table lists the measurement accuracy for the modules:
Quantity
Range
Accuracy
Phase-to-phase voltage
(1)
100…1150 V AC
± 0.5 % @ 45…66 Hz
Frequency
(2)
30…80 Hz
± 0.1 %
(3)
(1)
With phase-to-phase voltage V greater than 690 V AC rated voltage (maximum 760 V AC), in the presence of
external sockets and an isolation transformer.
(2)
The measurement of the frequency is available with a a phase-to-phase voltage value
≥
36 V AC, and is
unavailable with a phase-to-phase voltage value
≤
32 V AC.
(3)
In the absence of harmonic distortion.
Connections
The modules must be mounted directly on the Mainboard, to the right of the trip unit. In parallel they are
connected to a connector, to which the phase and neutral voltages arrive either on the internal contacts of
the circuit-breaker, or on the external sockets.
Information on the assembly is available on the website http://www.abb.com/abblibrary/DownloadCenter/, in
particular in the kit sheet
.
IMPORTANT: in the case of dielectric tests, you need to disconnect the modules as
illustrated in the assembly diagram, and to disconnect the external sockets from the
terminal box. It is not necessary to remove the modules.
An example with an E2.2 circuit-breaker in fixed and withdrawable versions is provided to the side.
The following is a view of the terminal box of E1.2 and E2.2-E4.2-E6.2 circuit-breakers with the relevant wiring
diagram:
R2
R1
U2
U1
38
36
35
98
96
95
YR
M
S33
S51
YO
EKIP Supply
Trip Unit I/O
Ge-
Ge
Szc
K2
K1
W4
W3
Q4
Q3
Q2
Q1
YC
YU
YO2
RTC
I/O
TU
44
42
41
34
32
31
24
22
21
14
12
11
C12
C13
C11
C2
C3
C1
D2
D1
48
46
45
Ne
Rca
Ne-
Gzi
Szo
Szi
Gzo
Rct
Vn
V1
V2
V3
Module
Module
YO
01
H4
02
K5
04
K10
K9
94
92
H3
91
81
H2
82
K4
K8
84
74
K7
K3
H1
72
71
61
HC
62
HC
64
54
52
51
Trip Unit I/O
HC
K6
Ge-
Ge
Szc
K2
K1
W4
W3
R2
R1
Q4
Q3
Q2
Q1
YC2
YC
YU
YO2
RTC
I/O
TU
44
42
41
34
32
31
24
22
21
14
12
11
C22
C21
C12
C13
C11
C2
C3
C1
D2
D1
48
46
45
Ne
Rca
Ne-
Gzi
Szo
Szi
Gzo
Rct
Vn
V1
V2
V3
U2
U1
38
36
35
98
96
95
YR
M
S33
S51
EKIP Signalling 4K
Q5..Q10
Module
Module
Module
EKIP Supply
20
V1
V1
V2
V2
V3
V3
VN
VN
L3
L2
L1
N
XV
XV
A4
X
A1
X
A4
L1 L2 L3
VN
VN
V3
V3
V2
V2
V1
V1
N
21
Ekip Measuring Pr
o
Ekip Measurin
g
Ekip
M
easuring Pr
o
Ekip Measurin
g
MEAS
K51
K51
MEAS
L3
L2
L1
N
A3
B3
a3
b3
A2
B2
a2
b2
TU1
A1
B1
a1
b1
23
Ekip Measuring Pr
o
Ekip Measurin
g
MEAS
K51
VN
VN
V3
V3
V2
V2
V1
V1
E)
*
Ekip
M
easuring Pr
o
22
V1
V1
V2
V2
V3
V3
VN
VN
L3
L2
L1
K51
MEAS
L3
L1 L2
GS
PE
3~
AB)
*
Diagrams 20 - 21 - 22 - 23
Further information is available on page 174, or on the website http://www.abb.com/abblibrary/
DownloadCenter/, where the wiring diagram is available
Содержание SACE Emax E1.2
Страница 2: ...ABB SACE Emax 2 2 2017 ABB 1SDH001330R0002 ECN000058721 Rev A ...
Страница 8: ...VI 2017 ABB SACE Emax 2 1SDH001330R0002 ECN000058721 Rev A ...
Страница 9: ...ABB SACE Emax 2 3 2017 ABB 1SDH001330R0002 ECN000058721 Rev A ...
Страница 310: ...ABB SACE Emax 2 304 2017 ABB 1SDH001330R0002 ECN000058721 Rev A Service 1 Power Care ...
Страница 311: ...1SDH001330R0002 ECN000058721 Rev A ...