Section 6
Establishing connection and
verifying the SPA/IEC communication
6.1
Entering settings
M11735-2 v2
If the IED is connected to a monitoring or control system via the rear SPA/IEC103 port, the SPA/
IEC103 port has to be set either for SPA or IEC103 use.
6.1.1
Entering SPA settings
M11735-7 v6
The SPA/IEC port is located on the rear side of the IED. Two types of interfaces can be used:
•
plastic fibers with connector type HFBR
•
glass fibers with connector type ST
When using the SPA protocol, the rear SPA/IEC port must be set for SPA use.
Procedure:
1.
Set the port for SPA use on the local HMI under
Main menu /Configuration /
Communication /Station communication/Port configuration /SLM optical serial port/
PROTOCOL:1
. When the communication protocol is selected, the IED is automatically
restarted, and the port then operates as a SPA port.
2.
Set the
SlaveAddress
and
BaudRate
for the rear SPA port on the local HMI under
Main menu/
Configuration/Communication/Station communication /SPA/SPA:1
. Use the same settings
for these as is set in the SMS system for the IED.
6.1.2
Entering IEC settings
M11735-32 v6
The SPA/IEC port is located on the rear side of the IED. Two types of interfaces can be used:
•
plastic fibers with connector type HFBR
•
glass fibers with connector type ST
When using the IEC protocol, the rear SPA/IEC port must be set for IEC use.
Procedure:
1.
Set the port for IEC use on the local HMI under
Main menu /Configuration /Communication /
Station communication/Port configuration /SLM optical serial port/PROTOCOL:1
. When
the communication protocol is selected, the IED is automatically restarted, and the port then
operates as an IEC port.
2.
Set the
SlaveAddress
and
BaudRate
for the rear IEC port on the local HMI under
Main menu /
Configuration/Communication /Station communication/IEC60870-5-103 /OPTICAL103:1
.
Use the same settings for these as is set in the SMS system for the IED.
6.2
Verifying the communication
M11735-77 v1
To verify that the rear communication with the SMS/SCS system is working, there are some different
methods. Choose one of the following.
1MRK 506 377-UEN Rev. K
Section 6
Establishing connection and verifying the SPA/IEC communication
Railway application RER670
45
Commissioning manual
© 2017 - 2021 Hitachi Power Grids. All rights reserved
Содержание Relion 670 series
Страница 1: ...Relion 670 SERIES Railway application RER670 Version 2 2 IEC Commissioning manual...
Страница 2: ......
Страница 22: ...16...
Страница 26: ...20...
Страница 38: ...32...
Страница 48: ...42...
Страница 54: ...48...
Страница 58: ...52...
Страница 72: ...66...
Страница 178: ...172...
Страница 186: ...180...
Страница 187: ...181...