10.4.5.2
Verifying the signals and settings
GUID-9545E35A-2419-4353-8165-97329B804BB3 v2
Keep the current constant while measuring operating characteristics. Keep the current as close as
possible to its rated value or lower. However, make sure it is higher than set minimum operating
current.
If the measurement of the operating characteristics runs under constant voltage conditions, ensure
that the maximum continuous current in an IED does not exceed four times its rated value.
Verifying mho offset characteristic
GUID-03EB19A6-A130-41E8-A8FF-D47C38BCF931 v2
To verify zone 1 mho offset characteristic, at least two points must be tested.
P1
P3
P4
jX (Ω)
ImpCharAng
ZxFwd
ZxRev
P2
IEC15000198-2-en.vsdx
R (Ω)
IEC15000198 V2 EN-US
Figure 26:
Commissioning test points for mho offset characteristic
Where,
ZxFwd
is the forward positive sequence impedance setting for zone x (where, x is 1- 3 depending
on the zone selected)
ZxRev
is the reverse positive sequence impedance setting for zone x (where, x is 1- 3 depending
on the zone selected)
ImpCharAng
is the impedance angle in deg
Test points
X
R
P1
ZxFwd
· sin(
ImpCharAng
)
ZxFwd
· cos(
ImpCharAng
)
P2
((
ZxFwd
-
ZxRev
) / 2) · sin(
ImpCharAng
)
ZxFwd
/ 2 · (1 + cos(
ImpCharAng
)) +
ZxRev
/ 2
· (1 – cos(
ImpCharAng
))
P3
((
ZxFwd
-
ZxRev
) / 2) · sin(
ImpCharAng
)
-
ZxFwd
/ 2 · (1 – cos(
ImpCharAng
)) -
ZxRev
/ 2
· (1 + cos(
ImpCharAng
))
P4
-
ZxRev
· sin(
ImpCharAng
)
-
ZxRev
· cos(
ImpCharAng
)
1.
Change the magnitude and angle of the voltage to achieve impedances at test points P1, P2, P3
and P4.
2.
For each test point, check that the output signals START and STZx (where, x is 1- 3 depending
on the zone selected) are activated.
3.
Signals TRIP and TRZx will be activated after operate time delay
tZx
for the respective zone has
elapsed.
Section 10
1MRK 506 377-UEN Rev. K
Testing functionality by secondary injection
98
Railway application RER670
Commissioning manual
© 2017 - 2021 Hitachi Power Grids. All rights reserved
Содержание Relion 670 series
Страница 1: ...Relion 670 SERIES Railway application RER670 Version 2 2 IEC Commissioning manual...
Страница 2: ......
Страница 22: ...16...
Страница 26: ...20...
Страница 38: ...32...
Страница 48: ...42...
Страница 54: ...48...
Страница 58: ...52...
Страница 72: ...66...
Страница 178: ...172...
Страница 186: ...180...
Страница 187: ...181...