10.1. Test the actual set value defined by
tDGasPresAlm
and
tDGasPresLO
.
10.2. The output GPRESALM is activated after a time greater than set time of
tDGasPresAlm
value if the input PRESALM is enabled.
10.3. The output GPRESLO is activated after a set time of
tDGasPresLO
value if the input
PRESLO is enabled.
10.12.3.2
Completing the test
GUID-0A16206F-690E-46EF-86F4-5A89E0BF640B v3
1.
Continue to test another function or end the test by changing the
Test mode
setting to
Off
.
2.
Restore connections and settings to their original values if they were changed for testing
purposes.
10.12.4
Event function EVENT
M11751-2 v5
Prepare the IED for verification of settings as outlined in section
in this chapter.
During testing, the IED can be set when in test mode from PST. The functionality of the event
reporting during test mode is set in the Parameter Setting tool in PCM600.
•
Use event masks
•
Report no events
•
Report all events
In test mode, individual event blocks can be blocked from PCM600.
10.12.5
Limit counter L4UFCNT
GUID-7EBDC372-3407-4577-8B9A-6AB1758A1F34 v2
The Limit counter function L4UFCNT can be tested by connecting a binary input to the counter and
applying pulses to the counter. The speed of the pulses must not exceed the cycle time of the
function. Normally the counter will be tested when testing the function that the counter is connected
to, such as the trip function. When the function is configured, test it together with the function that
operates it. Trigger the function and check that the counter result corresponds to the number of
operations.
10.12.5.1
Completing the test
GUID-325F040B-BADC-4281-B965-9B7D6BFA3E15 v2
Continue to test another function or end the test by changing the Test mode setting to
Off
. Restore
connections and settings to their original values, if they were changed for testing purposes.
10.12.6
Fault locator RWRFLO
GUID-345068D9-3CD0-41F5-BEEA-85D39DD5EDEF v1
Prepare the IED for verification of settings outlined in Section
"Preparing the IED to verify settings"
10.12.6.1
Function revision history
GUID-24E8B083-D1E2-4323-8008-2071E5CF5A0A v3
Document
revision
Product
revision
History
A
2.2.1
-
B
2.2.1
-
C
2.2.2
Included fault locator for traction supply system.
D
2.2.3
-
Table continues on next page
Section 10
1MRK 506 377-UEN Rev. K
Testing functionality by secondary injection
144
Railway application RER670
Commissioning manual
© 2017 - 2021 Hitachi Power Grids. All rights reserved
Содержание Relion 670 series
Страница 1: ...Relion 670 SERIES Railway application RER670 Version 2 2 IEC Commissioning manual...
Страница 2: ......
Страница 22: ...16...
Страница 26: ...20...
Страница 38: ...32...
Страница 48: ...42...
Страница 54: ...48...
Страница 58: ...52...
Страница 72: ...66...
Страница 178: ...172...
Страница 186: ...180...
Страница 187: ...181...