The fuse supervision is connected to ULN1OK-ULN1FF, ULN2OK-ULN2FF and
with alternative Healthy or Failing MCB signals depending on what is available from
each MCB.
The tie circuit breaker is connected either to bus 1 or line 1 voltage on one side and the
other side is connected either to bus 2 or line 2 voltage. Four different output
combinations are possible, bus to bus, bus to line, line to bus and line to line.
•
The line 1 voltage is selected if the line 1 disconnector is closed.
•
The bus 1 voltage is selected if the line 1 disconnector is open and the bus 1 circuit
breaker is closed.
•
The line 2 voltage is selected if the line 2 disconnector is closed.
•
The bus 2 voltage is selected if the line 2 disconnector is open and the bus 2 circuit
breaker is closed.
The function also checks the fuse-failure signals for bus 1, bus 2, line 1 and line 2. If
a VT failure is detected in the selected voltage an output signal USELFAIL is set. This
output signal is true if the selected bus or line voltages have a MCB trip. This output
as well as the function can be blocked with the input signal BLOCK. The function
block diagram for the voltage selection of a bus circuit breaker is shown in figure
and for the tie circuit breaker in figure
.
Section 10
1MRK 505 288-UEN A
Control
174
Technical manual
Содержание Relion 650 Series REB650
Страница 1: ...Relion 650 series Busbar protection REB650 Technical manual ...
Страница 2: ......
Страница 36: ...30 ...
Страница 44: ...38 ...
Страница 58: ...52 ...
Страница 80: ...74 ...
Страница 84: ...78 ...
Страница 152: ...146 ...
Страница 278: ...272 ...
Страница 316: ...310 ...
Страница 432: ...426 ...
Страница 504: ...498 ...
Страница 518: ...512 ...
Страница 566: ...560 ...
Страница 567: ...561 ...