![ABB Relion 611 Series Скачать руководство пользователя страница 30](http://html1.mh-extra.com/html/abb/relion-611-series/relion-611-series_engineering-manual_3449131030.webp)
GUID-CD8A9C2A-0CF0-451F-A820-82482C646EB3 V1 EN
Figure 5:
Selecting the connectivity packages
3.2.2
Activating connectivity packages
The relay connectivity package has to be installed before it can be activated in Update
Manager.
1.
Select
Manage Connectivity Packages
from the menu on the left column to
access the installed connectivity packages.
2.
Browse the tree structure to find the correct product.
3.
Select the connectivity package version from the drop-down list beside the
product name.
Always use the latest version of the connectivity package.
4.
Click
Apply
to activate the connectivity package.
PCM600 recognizes the installed connectivity packages during start-up, and the
corresponding IED types are available in PCM600 when starting a new project.
3.3
PCM600 projects
A typical project in PCM600 contains a plant structure including one or several IED
objects, where each IED object contains the engineering data created or modified
using the different PCM600 tools.
Section 3
1MRS241255 B
PCM600 tool
22
611 series
Engineering Manual