Scheme communication logic for residual
overcurrent protection (EFC)
Chapter 10
Verifying settings by secondary
injection
11. Switch on the fault current (110% of the setting) and wait long-
er than the set value tCoord.
No EFC--TRIP signal should appear.
12. Switch off the fault current and the polarising voltage.
13. Reset the EFC--BLOCK digital input.
15.1.2
Permissive scheme
Procedure
1.
Inject the polarising voltage 3U0 to 5% of Ub and the phase
angle between voltage and current to 65°, the current lagging
the voltage.
2.
Inject current (65° lagging the voltage) in one phase to about
110% of the setting operating current, and switch off the cur-
rent with the switch.
3.
Switch on the fault current (110% of the setting) and wait long-
er than the set value tCoord.
No EFC--TRIP signal should appear, and the EFC--CS binary out-
put should be activated.
4.
Switch off the fault current.
5.
Activate the EFC--CR binary input.
6.
Switch on the fault current (110% of the setting) and measure
the operating time of the EFC logic.
Use the EFC--TRIP signal from the configured binary output to
stop the timer.
7.
Compare the measured time with the set value tCoord.
8.
Activate the EFC--BLOCK digital input.
9.
Switch on the fault current (110% of the setting) and wait long-
er than the set value tCoord.
No EFC--TRIP signal should appear.
10. Switch off the fault current and the polarising voltage.
11. Reset the EFC--CR binary input and the EFC--BLOCK digital
input.
15.2
Completing the test
Continue to test another function or complete the test by setting the test mode to off.
Содержание REL 505-C1 2.3 Series
Страница 16: ...10 Note signs Chapter 2 Safety information ...
Страница 40: ...34 Checking the binary I O circuits Chapter 6 Checking the external circuitry ...
Страница 110: ...104 Two step time delayed phase overcurrent protection TOC2 Chapter 10 Verifying settings by secondary injection ...
Страница 114: ...108 Testing the interaction of the distance protection Chapter 11 Verifying the internal configuration ...