Preparing for test
Chapter 10
Verifying settings by secondary
injection
3.
Select ‘No’.
4.
Press ‘C’ twice to leave the menu.
The ‘Save TestGroup?’ dialog appears.
5.
Choose ‘Yes’ leave the menu.
2.7
Checking the disturbance report settings
The terminal must be set in testmode (Operation=ON) to activate the disturbance report
settings.
The user can select how the disturbances are indicated on the local HMI during the test.
The user can for example select if the disturbance summary should be stored, scrolled
on the local HMI or if LED information should be stored. Scroll to the disturbance re-
port settings which are located in the local HMI under:
Содержание REL 505-C1 2.3 Series
Страница 16: ...10 Note signs Chapter 2 Safety information ...
Страница 40: ...34 Checking the binary I O circuits Chapter 6 Checking the external circuitry ...
Страница 110: ...104 Two step time delayed phase overcurrent protection TOC2 Chapter 10 Verifying settings by secondary injection ...
Страница 114: ...108 Testing the interaction of the distance protection Chapter 11 Verifying the internal configuration ...