Introduction to the installation and
commissioning manual
Chapter 1
Introduction
1.3.2
Requirements
The installation personnel must have a basic knowledge in handling electronic equip-
ment. The commissioning and maintenance personnel must be well experienced in us-
ing protection equipment, test equipment, protection functions and the configured
functional logics in the protection.
1.4
Related documents
1.5
Revision notes
Documents related to REL 505-C1*2.3
Identity number
Operator’s manual
1MRK 506 092-UEN
Installation and commissioning manual
1MRK 506 094-UEN
Technical reference manual
1MRK 506 093-UEN
Application manual
1MRK 506 115-UEN
Technical overview brochure
1MRK 506 091-BEN
Revision
Description
2.3-00
First revision
Содержание REL 505-C1 2.3 Series
Страница 16: ...10 Note signs Chapter 2 Safety information ...
Страница 40: ...34 Checking the binary I O circuits Chapter 6 Checking the external circuitry ...
Страница 110: ...104 Two step time delayed phase overcurrent protection TOC2 Chapter 10 Verifying settings by secondary injection ...
Страница 114: ...108 Testing the interaction of the distance protection Chapter 11 Verifying the internal configuration ...