6.5.3.2
Completing the test
Continue to test another function or end the testing by setting the parameter
TestMode
to
Off
under
Main menu/Tests/IED test mode/TESTMODE:1
. If another function
is tested, then set the parameter
Blocked
to
No
under
Main menu/Tests/Function test
modes/Current/SDEPSDE(67N,IN<->)/SDEPSDE:1
for the function, or for each
individual function in a chain, to be tested next. Remember to set the parameter
Blocked
to
Yes
, for each individual function that has been tested.
6.5.4
Thermal overload protection, two time constants TRPTTR
Prepare the IED for verification of settings as outlined in
.
Values of the logical signals for TRPTTR are available on the local HMI under
Main
menu/Tests/Function status/Current/TRPTTR(49,T>)/TRPTTR:X
. The Signal
Monitoring in PCM600 shows the same signals that are available on the local HMI.
6.5.4.1
Checking operate and reset values
1.
Connect symmetrical three-phase currents to the appropriate current terminals
of the IED.
2.
Set the Time constant 1 (
Tau1
) and Time Constant 2 (
Tau2
) temporarily to 1
minute.
3.
Set the three-phase injection currents slightly lower than the set operate value of
stage
IBase1
, increase the current in phase L1 until stage
IBase1
operates and
note the operate value.
Observe the maximum permitted overloading of the current
circuits in the IED.
4.
Decrease the current slowly and note the reset value.
Check, in the same way, the operate and reset values of
IBase1
for phases L2 and
L3.
5.
Activate the cooling input signal, thus switching to base current
IBase2
.
6.
Check the operate and reset values (for all three phases) for
IBase2
in the same
way as described above for stage
IBase1
.
7.
Deactivate the input signal for stage
IBase2
.
8.
Set the time constant for
IBase1
in accordance with the setting plan.
9.
Set the injection current for phase L1 to 1.50 ·
IBase1
.
10. Connect a trip output contact to the timer and monitor the output of contacts
ALARM1 and ALARM2 to digital inputs in test equipment.
Read the heat content in the thermal protection from the local HMI and wait until
the content is zero.
1MRK 502 049-UEN A
Section 6
Testing functionality
67
Commissioning manual
Содержание REG650 ANSI
Страница 1: ...Relion 650 series Generator protection REG650 Commissioning manual...
Страница 2: ......
Страница 8: ......
Страница 20: ...12...
Страница 40: ...32...
Страница 42: ...34...
Страница 50: ...42...
Страница 120: ...112...
Страница 126: ...118...
Страница 142: ...134...
Страница 143: ...135...