![ABB PVS300 Скачать руководство пользователя страница 94](http://html.mh-extra.com/html/abb/pvs300/pvs300_product-manual_4153094.webp)
94 Operation
Note:
The local regulations in Italy require that the self test is performed successfully
during commissioning. If the self test is unsuccessful in Italy, the inverter shall not
connect to the grid. For more guidance on the self test function, please see
Further
information
on page
129
.
Special screens
Special screens appear in situations where it is not applicable to show the device
status. These screens are characterized by the lack of a status bar and softkey bar.
The Special screens include:
• The boot screen which appears when the control unit is connecting to the inverter.
• The splash screen which appears while the user interface is loading.
• The connection failure screen which indicates that the control unit and inverter are
not communicating properly.
Messages
Messages indicate the presence of a fault, warning or maintenance reminder. They
typically consist of one view, which appears automatically when a particular event
happens.
Displays a problem in operation. Push the left softkey to hide/clear the message from
the screen.
If there are several active messages, the user must hide/clear the most recent
message to see any other active messages.
Help
Help pages contain context-sensitive problem-solving instructions and descriptions of
functions and parameters. Press the Help (?) button to display the help page, if there
is one, for the currently selected fault, menu item, parameter etc.
Progress indication
A progress bar is shown whenever the panel is busy. The user interface cannot be
operated while the progress bar is showing. The progress bar automatically
disappears when done.
Содержание PVS300
Страница 1: ...ABB solar inverters Product manual PVS300 string inverters ...
Страница 4: ......
Страница 9: ...Table of contents 9 Further information ...
Страница 10: ...10 Table of contents ...
Страница 34: ...34 Operation basics and hardware description ...
Страница 48: ...48 Planning the installation ...
Страница 76: ...76 Installation checklist ...
Страница 110: ...110 Troubleshooting ...
Страница 120: ...120 Technical data ...
Страница 122: ...122 Dimension drawing 3AUA0000094904 ...
Страница 123: ...Dimension drawing 123 Required clearances for cooling ...
Страница 124: ...124 Dimension drawing ...
Страница 126: ...126 Navigation map The navigation map ...
Страница 127: ...Navigation map 127 ...
Страница 128: ...128 Navigation map ...
Страница 130: ...3AUA0000096321 Rev B EN EFFECTIVE 2013 03 14 Contact us www abb com solar ...