![ABB PVS300 Скачать руководство пользователя страница 85](http://html.mh-extra.com/html/abb/pvs300/pvs300_product-manual_4153085.webp)
Operation 85
The operating modes of the PVS300 string inverter
Operating status Example graphical display
Description
Sleep
This is a low power consumption mode in
which only essential electronics use
power. The inverter enters sleep mode
when the DC input voltage is below a
threshold value and there is no control
unit activity during the threshold time
period. The power meter shows “-- kW”
when the inverter is going to sleep.
Stand-by
From sleep mode, the inverter switches
to stand-by mode if the DC voltage rises
above the threshold value or if there is
control unit activity (wake up call by the
user).
In stand-by mode, the inverter performs
continuous monitoring and the testing
required for safe grid connection.
The power meter shows “-- kW” when the
inverter is on stand-by.
Note:
During stand-by operation the
inverter can draw power from the solar
array or the electrical grid.
Normal operation
The inverter has established a grid
connection. The solar array is producing
adequate electrical power which is being
fed to the grid. The rays of the sun
symbol are used to show the current
output power level Check output view of
the control unit. The power meter shows
the output power in the form “x.xx kW”
when the inverter is in normal operation.
Limited operation
Note:
Like Normal operation
but less of the sun symbol’s
rays are filled.
The inverter is operating with a limited
power output. Check events from the
control unit. The power meter shows the
output power in the form “x.xx kW” when
the inverter is in limited operation.
The control unit’s LED flashes green
during limited operation.
Содержание PVS300
Страница 1: ...ABB solar inverters Product manual PVS300 string inverters ...
Страница 4: ......
Страница 9: ...Table of contents 9 Further information ...
Страница 10: ...10 Table of contents ...
Страница 34: ...34 Operation basics and hardware description ...
Страница 48: ...48 Planning the installation ...
Страница 76: ...76 Installation checklist ...
Страница 110: ...110 Troubleshooting ...
Страница 120: ...120 Technical data ...
Страница 122: ...122 Dimension drawing 3AUA0000094904 ...
Страница 123: ...Dimension drawing 123 Required clearances for cooling ...
Страница 124: ...124 Dimension drawing ...
Страница 126: ...126 Navigation map The navigation map ...
Страница 127: ...Navigation map 127 ...
Страница 128: ...128 Navigation map ...
Страница 130: ...3AUA0000096321 Rev B EN EFFECTIVE 2013 03 14 Contact us www abb com solar ...