![ABB PVS300 Скачать руководство пользователя страница 21](http://html.mh-extra.com/html/abb/pvs300/pvs300_product-manual_4153021.webp)
Introduction to the manual 21
Terms and abbreviations
Term/abbreviation
Explanation
AC
Alternating current.
Cable lug
A connector which is crimped onto the end of cable. Also known
as a crimp connector or cable anchor.
Circuit breaker
Automatic switch which will trip to OFF and protect the load
circuit in the event of short circuit and overcurrent situations.
Control board
Circuit board in which the control program runs.
DC
Direct current.
EFB
Embedded fieldbus.
EMC
Electromagnetic compatibility.
EMI
Electromagnetic interference.
IGBT
Insulated-gate bipolar transistor.
Inverter
Converts direct current and voltage to alternating current and
voltage.
I2I
Inverter to inverter communication protocol.
LED
Light emitting diode.
Main disconnector
A manually controlled power contactor or manually operated
isolation switch which can be locked in the open position. It is
used to cut off the power supply from the whole distribution
board.
Maximum power point
tracking
Inverter software function that automatically operates the solar
generator, array, string or module at its maximum power point.
MPPT
Maximum power point tracker.
Parameter
User-adjustable operation instruction to the inverter, or signal
measured or calculated by the inverter.
Photovoltaic cell,
generator, module,
string, array and array
junction box
In this manual, solar power system components based on
photovoltaic effect are called solar cell, solar module, solar array,
solar string and solar array junction box as defined below.
Protective earth (PE)
Connection of a point in the equipment, system, or installation to
earth, for protection against electric shock in case of a fault.
RCMU
AC and DC sensitive residual current monitoring unit measures
currents of L and N conductor.
Содержание PVS300
Страница 1: ...ABB solar inverters Product manual PVS300 string inverters ...
Страница 4: ......
Страница 9: ...Table of contents 9 Further information ...
Страница 10: ...10 Table of contents ...
Страница 34: ...34 Operation basics and hardware description ...
Страница 48: ...48 Planning the installation ...
Страница 76: ...76 Installation checklist ...
Страница 110: ...110 Troubleshooting ...
Страница 120: ...120 Technical data ...
Страница 122: ...122 Dimension drawing 3AUA0000094904 ...
Страница 123: ...Dimension drawing 123 Required clearances for cooling ...
Страница 124: ...124 Dimension drawing ...
Страница 126: ...126 Navigation map The navigation map ...
Страница 127: ...Navigation map 127 ...
Страница 128: ...128 Navigation map ...
Страница 130: ...3AUA0000096321 Rev B EN EFFECTIVE 2013 03 14 Contact us www abb com solar ...