![ABB PVS300 Скачать руководство пользователя страница 57](http://html.mh-extra.com/html/abb/pvs300/pvs300_product-manual_4153057.webp)
Electrical installation 57
6
Electrical installation
What this chapter contains
This chapter describes the electrical installation process for the inverter. It explains
how to fit connectors and to perform cabling. It also presents the purpose and pinout
of each connector.
See section
Safety during installation and maintenance
on page
13
.
Isolate the inverter from all power sources during installation and cabling work. See
Isolating the inverter from external power sources
on page
14
.
See section
Technical data
on page
113
.
Make sure that you have all necessary tools. See
Daisy-chaining of EIA/RS-485
transmission line
on page
40
.
See
Selecting the power cables
on page
37
.
See
Recommended AC output power cable types
on page
38
.
WARNING!
The work described in this chapter may only be carried out by a
qualified electrician. Follow the instructions in chapter
Safety
on page
11
.
Ignoring the safety instructions can cause injury or death, increased electromagnetic
interference and equipment malfunction.
Note:
The installation must always be designed and made according to applicable
local laws and regulations. ABB does not assume any liability whatsoever for any
installation which breaches the local laws and/or other regulations. Furthermore, if the
recommendations given by ABB are not followed, the inverter may experience
problems that the warranty does not cover.
Содержание PVS300
Страница 1: ...ABB solar inverters Product manual PVS300 string inverters ...
Страница 4: ......
Страница 9: ...Table of contents 9 Further information ...
Страница 10: ...10 Table of contents ...
Страница 34: ...34 Operation basics and hardware description ...
Страница 48: ...48 Planning the installation ...
Страница 76: ...76 Installation checklist ...
Страница 110: ...110 Troubleshooting ...
Страница 120: ...120 Technical data ...
Страница 122: ...122 Dimension drawing 3AUA0000094904 ...
Страница 123: ...Dimension drawing 123 Required clearances for cooling ...
Страница 124: ...124 Dimension drawing ...
Страница 126: ...126 Navigation map The navigation map ...
Страница 127: ...Navigation map 127 ...
Страница 128: ...128 Navigation map ...
Страница 130: ...3AUA0000096321 Rev B EN EFFECTIVE 2013 03 14 Contact us www abb com solar ...