Tension Electronics PFEA113, User Manual
Section E.7.1 Routing the Load Cell Cable
3BSE029382R0101 Rev C
E-9
Figure E-3. Drilling Dowel Pin Holes
E.7.1 Routing the Load Cell Cable
The cable must be supported with clamps and routed to prevent force shunting through the
cable.
c
c
b
b
NOTE
Do not drill in this
a
B/BE/BER
Tubular
dowel pin
a
a
a
Load cell PFTL 101
a
b
c
A/AE/AER
8
15 15
15
12
20
8.4
12.5
area, as internal
wiring may be
damaged.
Содержание PFEA 113
Страница 32: ...Tension Electronics PFEA113 User Manual Chapter 2 Installation 2 16 3BSE029382R0101 Rev C ...
Страница 92: ...Tension Electronics PFEA113 User Manual Chapter 5 Maintenance 5 2 3BSE029382R0101 Rev C ...
Страница 104: ...Tension Electronics PFEA113 User Manual Chapter 6 Fault tracing 6 12 3BSE029382R0101 Rev C ...
Страница 259: ......