Tension Electronics PFEA113, User Manual
Chapter 2 Installation
2-2
3BSE029382R0101 Rev C
2.4 Installing the Electronic Unit
2.4.1 Selecting and Routing the Cabling
2.4.1.1 Recommended Cabling
The cabling between the load cells and the electronic unit and electrical connections must be
carefully carried out in accordance with connection diagram 3BSE028144D0065 (See the
appendix for your type of load cell) or according to order-specific documentation.
Figure 2-1. Recommended Cabling
n × 0.5 mm
2
+ screen
To control system
Mains supply
3 × 1.5 mm
2
Junction Box
Load cell signals
4 × 2 × 0.5 mm
2
+ screen
Load cell excitation
2 × 2.5 mm
2
4 × 1.0 mm
2
+ screen
max. 50 m
External indicating
instrument
(not included in
the ABB delivery)
Load cells
PFEA113
IP 65-version
Profibus-DP
Cable screens should be connected:
- to an earth bar close to the
IP 20-version (unsealed)
- to the earth bar fitted inside the
enclosure of the IP 65-version
(NEMA 4)
(NEMA 4)
A
B
C
D
Содержание PFEA 113
Страница 32: ...Tension Electronics PFEA113 User Manual Chapter 2 Installation 2 16 3BSE029382R0101 Rev C ...
Страница 92: ...Tension Electronics PFEA113 User Manual Chapter 5 Maintenance 5 2 3BSE029382R0101 Rev C ...
Страница 104: ...Tension Electronics PFEA113 User Manual Chapter 6 Fault tracing 6 12 3BSE029382R0101 Rev C ...
Страница 259: ......