7.6.2. Electrical installation checklist
1) Types and cross sections of control cables suitable for the signal type and signal
level.
2) Types and cross sections of power cables selected according to the ABB power
cable specification.
3) Cable entries are prepared according to the instructions in this user manual
(3BHS600000 E40).
4) Control cable screens and conductors are connected as instructed in this user
manual (3BHS600000 E40), labeled appropriately, and the customer side
connections are completed.
5) Wiring across shipping splits is completed according to the instructions in this
user manual (3BHS600000 E40).
6) Ground cable of the converter is securely connected at both ends.
7) Cable armor and screens of power supply cables are connected to the ground
busbar.
8) All power cables plugs are mounted and connected to the converter.
9) CTs and VTs are selected and installed according ABB specification.
10) Overriding Control is prepared and tested for starting, operation & emergency
sequences for commissioning and for full control.
11) A Communication Test with the converter controller and the overriding system
has been successfully done (recommended to reduce the onsite commissioning
time).
12) Turbine pitch and braking system is commissioned and is able to stop the
generator mechanically in case of emergency at any time without the help of the
converter.
13) Ethernet connection between the converter and Internet is done and VPN
connection for ABB is established to give ABB the possibility to support the
commissioning via remote.