![ABB PCS6000 Скачать руководство пользователя страница 90](http://html1.mh-extra.com/html/abb/pcs6000/pcs6000_user-manual_3052170090.webp)
COMMISSIONING
PRODUCT
PCS6000
DOCUMENT KIND
User manual
DOCUMENT ID.
3BHS600000 E40
REV.
G
LANG.
en
PAGE
7.6. Commissioning checklists
These checklists are designed to help you prepare the converter and associated equipment
for commissioning.
7.6.1. Mechanical installation checklist
1) Converter is aligned according to layout drawing (if delivered in several transport
units) and installed according to the instructions in this user manual
(3BHS600000 E40).
2) Converter is securely fixed to the floor.
3) Roof attachments are installed (if applicable).
4) External water piping is completed and pipes are flanged to the converter.
5) External cooling system is ready for operation.
6) Visual inspection:
• No badly affixed or damaged components
• No foreign objects left in the cabinet
• No dirt, dust or moisture in the cabinet