![ABB IRBP Скачать руководство пользователя страница 223](http://html.mh-extra.com/html/abb/irbp/irbp_product-manual_5096223.webp)
6.4.2 Checking insulation
Measuring points
xx1000000209
Gearbox body (clean surface)
1
Ground point in the AC motor.
2
DANGER
Turn off all:
•
electric power supply
•
hydraulic pressure supply
•
air pressure supply
to the robot, before entering the safeguarded space.
Insulation resistance tests
Insulation resistance greater than 2.5 MOhm at 500 V DC between the output shaft
(Gearbox body) and the ground point in the AC motor.
Voltage tests
1 kVolt AC 50/60 Hz - 1 sec. between the output shaft (gearbox body) and the
ground point in the AC motor. The test voltage is to be supplied from a transformer
with a minimum rating of 500 VA.
Product manual - IRBP /D2009
223
3HAC037731-001 Revision: T
© Copyright 2010-2020 ABB. All rights reserved.
6 Repair
6.4.2 Checking insulation
Содержание IRBP
Страница 1: ...ROBOTICS Product manual IRBP D2009 ...
Страница 2: ...Trace back information Workspace 20A version a6 Checked in 2020 03 05 Skribenta version 5 3 033 ...
Страница 38: ...This page is intentionally left blank ...
Страница 70: ...This page is intentionally left blank ...
Страница 250: ...This page is intentionally left blank ...
Страница 264: ...This page is intentionally left blank ...
Страница 314: ...This page is intentionally left blank ...
Страница 330: ...This page is intentionally left blank ...
Страница 333: ......