Note
Action
Remove the motor (9).
6
Remove the o-ring (7).
7
Remove the insulating material and insulating tubes
(5, 6, 8).
8
Refit motor rotary units axis 2-3
CAUTION
Do not mix motors
valid from
serial number SEROP POF-110001- & CNAUS
POF-510001-, with motors
valid up to
serial numbers SEROP -POF 110000 &
CNAUS -POF 510000. They are not compatible.
Note
Action
Refit the insulating material and insulating tubes (5,
6, 8).
1
Refit the o-ring (7) on the motor.
2
Use standard torque, see section
3
2
1
xx1500002519
Refit the motor using the attachment screws and
plain washers (4-5).
Note
If countersunk holes in motor flange. Make sure that
the plane washer is mounted before the insulating
washer to fill out the recess.
3
1
Attachment screw
2
Insulating washer
3
Plane washer
Connect all connectors.
4
Refit the cable gland cover at the cable exit.
5
Refit the cover plate (2).
6
222
Product manual - IRBP /D2009
3HAC037731-001 Revision: T
© Copyright 2010-2020 ABB. All rights reserved.
6 Repair
6.4.1 Replacing motors
Continued
Содержание IRBP
Страница 1: ...ROBOTICS Product manual IRBP D2009 ...
Страница 2: ...Trace back information Workspace 20A version a6 Checked in 2020 03 05 Skribenta version 5 3 033 ...
Страница 38: ...This page is intentionally left blank ...
Страница 70: ...This page is intentionally left blank ...
Страница 250: ...This page is intentionally left blank ...
Страница 264: ...This page is intentionally left blank ...
Страница 314: ...This page is intentionally left blank ...
Страница 330: ...This page is intentionally left blank ...
Страница 333: ......