
Information
Action
xx1500001957
Fill oil in expansion container, and press
down the
VK-cover
. Secure with three screws
and washers.
7
Place the
expansion container
in the base
and place it so the drain holes match.
8
xx1500001959
Secure the expansion container with the
at-
tachment screws
and
washers
.
9
Tightening torque 6 Nm.
Check the
o-ring
used on the cover. Replace
it if damaged.
10
Refit the
cover
on the base with its
attach-
ment screws
.
11
Turn the robot so it is not suspended.
12
Turn the robot to suspended position.
13
See procedure for suspended robot,
specting oil level, axis 1 gearbox on
page 113
.
Inspect the oil level.
14
Product manual - IRB 4600 Foundry Prime
91
3HAC040585-001 Revision: M
© Copyright 2013-2018 ABB. All rights reserved.
2 Installation and commissioning
2.6.1 Installing an expansion container
Continued
Содержание IRB 4600 Foundry Prime
Страница 1: ...ROBOTICS Product manual IRB 4600 Foundry Prime ...
Страница 2: ...Trace back information Workspace R18 2 version a18 Checked in 2018 11 20 Skribenta version 5 3 012 ...
Страница 106: ...This page is intentionally left blank ...
Страница 194: ...This page is intentionally left blank ...
Страница 398: ...This page is intentionally left blank ...
Страница 400: ...This page is intentionally left blank ...
Страница 406: ......
Страница 407: ......