
Removing the SMB unit
Use this procedure to remove the SMB unit.
Note
Action
Decide which calibration routine to use, and
take actions accordingly prior to beginning
the repair procedure.
1
DANGER
Turn off all:
•
electric power supply
•
hydraulic pressure supply
to the robot, before entering the robot
working area.
2
CAUTION
Always cut the paint with a knife and grind
the paint edge when disassembling parts.
See
Cut the paint or surface on the robot
before replacing parts on page 201
3
A
B
C
xx0900000103
Remove the
base cover
.
CAUTION
Clean cover from metal residues before
opening.
Metal residues can cause shortage on the
boards which can result in hazardous fail-
ures.
4
Parts:
A Attachment screws (6 pcs)
B Base cover
C Cable straps, securing the battery
cable (2 pcs)
Cut the
cable straps
securing the battery
cable.
5
Continues on next page
Product manual - IRB 4600 Foundry Prime
247
3HAC040585-001 Revision: M
© Copyright 2013-2018 ABB. All rights reserved.
4 Repair
4.3.4 Replacing SMB unit
Continued
Содержание IRB 4600 Foundry Prime
Страница 1: ...ROBOTICS Product manual IRB 4600 Foundry Prime ...
Страница 2: ...Trace back information Workspace R18 2 version a18 Checked in 2018 11 20 Skribenta version 5 3 012 ...
Страница 106: ...This page is intentionally left blank ...
Страница 194: ...This page is intentionally left blank ...
Страница 398: ...This page is intentionally left blank ...
Страница 400: ...This page is intentionally left blank ...
Страница 406: ......
Страница 407: ......