
Motor axis 3
Motor axis 2
M8x30
13 mm
M10x35
16 mm
xx0900000443
Flange thickness
A
Preparations before the refitting of motors
Use this procedure to make necessary preparations before refitting motors.
Note
Action
DANGER
Turn off all:
•
electric power supply
•
hydraulic pressure supply
to the robot, before entering the robot working
area.
1
Grind the paint on the surface carefully to get
a smoth surface.
2
Clean the surface from contamination such as
oil and dirt.
3
Remove any painting from the assembly sur-
faces, with a knife.
Make sure that the motor and the pinion are
not damaged or scratched.
4
Lightly lubricate the o-ring with
grease
.
5
xx0900000082
Make sure the
o-ring
on the flange of the motor
is seated properly.
6
Parts:
•
A: Correct position of o-ring
•
B: Incorrect position of o-ring !
Replace with a new o-ring if damaged!
Continues on next page
Product manual - IRB 4600 Foundry Prime
319
3HAC040585-001 Revision: M
© Copyright 2013-2018 ABB. All rights reserved.
4 Repair
4.7.2 Refitting motors
Continued
Содержание IRB 4600 Foundry Prime
Страница 1: ...ROBOTICS Product manual IRB 4600 Foundry Prime ...
Страница 2: ...Trace back information Workspace R18 2 version a18 Checked in 2018 11 20 Skribenta version 5 3 012 ...
Страница 106: ...This page is intentionally left blank ...
Страница 194: ...This page is intentionally left blank ...
Страница 398: ...This page is intentionally left blank ...
Страница 400: ...This page is intentionally left blank ...
Страница 406: ......
Страница 407: ......