
Note
Action
See
Performing a leak-down test on
.
Perform a leak-down test.
16
Specified in
.
Fit
guide pins
in the upper arm.
17
Move the upper arm to its mounting posi-
tion.
18
(With the brakes of the axis 3 motor still re-
leased.)
See the figure in:
•
Location of the complete upper arm
on page 267
Tightening torque:
•
35 Nm
Refit the upper arm to the lower arm with
its
attachment screws
.
19
Remove the guide pins and replace with the
remaining attachment screws.
20
Remove the 24 VDC power supply.
21
Tightening torque: 14 Nm.
Refit the upper armhouse cover with its at-
tachment screws and washers.
WARNING
The cover on the armhouse must be fitted
when the robot is running. It is a vital part
for the stability of the robot.
22
Make sure that the cover is tightly sealed.
A
B
xx0800000389
Parts:
•
A: Cover
•
B: Attachment screws M6x25,
quality 8.8-A2F (10 pcs)
Make sure that the armhouse cover is tightly
fitted. If there is a gap between the cover
and the robot, seal with Sikaflex 521 FC.
23
Continues on next page
Product manual - IRB 4600 Foundry Prime
351
3HAC040585-001 Revision: M
© Copyright 2013-2018 ABB. All rights reserved.
4 Repair
4.8.3 Replacing gearbox axis 3
Continued
Содержание IRB 4600 Foundry Prime
Страница 1: ...ROBOTICS Product manual IRB 4600 Foundry Prime ...
Страница 2: ...Trace back information Workspace R18 2 version a18 Checked in 2018 11 20 Skribenta version 5 3 012 ...
Страница 106: ...This page is intentionally left blank ...
Страница 194: ...This page is intentionally left blank ...
Страница 398: ...This page is intentionally left blank ...
Страница 400: ...This page is intentionally left blank ...
Страница 406: ......
Страница 407: ......