Refitting, serial measurement unit
The procedure below details how to refit the complete serial measurement unit.
Note/Illustration
Action
DANGER
Turn off all:
•
electric power supply
•
hydraulic pressure supply
•
air pressure supply (do not turn off for
Foundry Prime robots!)
to the robot, before entering the robot working
area.
1
ELECTROSTATIC DISCHARGE (ESD)
The unit is sensitive to ESD. Before handling the
unit read the safety information in section
unit is sensitive to ESD on page 32
2
Art. no. is specified in
.
Refit the connectors to the
serial measurement
unit
.
Make sure the lock on the battery cable connector
R2.G snaps into place during refitting.
3
The connectors are shown in
the figure
serial measurement unit on
page 206
.
Refit the serial measurement unit inside the base
using nuts.
4
Strap the cables.
5
Shown in the figure
serial measurement unit on
page 206
.
Refit the
rear cover plate
on the base.
6
Calibration is detailed in a sep-
arate calibration manual en-
closed with the calibration
tools.
Recalibrate the robot!
7
General calibration information
is included in section
Product manual - IRB 4400
209
3HAC022032-001 Revision: Q
© Copyright 2004-2018 ABB. All rights reserved.
4 Repair
4.6.2 Replacement of serial measurement unit
Continued
Содержание IRB 4400 - L10
Страница 1: ...ROBOTICS Product manual IRB 4400 ...
Страница 2: ...Trace back information Workspace R18 1 version a9 Checked in 2018 03 22 Skribenta version 5 2 025 ...
Страница 8: ...This page is intentionally left blank ...
Страница 94: ...This page is intentionally left blank ...
Страница 282: ...This page is intentionally left blank ...
Страница 294: ...This page is intentionally left blank ...
Страница 296: ...This page is intentionally left blank ...
Страница 302: ......
Страница 303: ......