Information
Action
xx0900000611
Remove the
timing belt
from the
pulleys
.
9
Parts:
•
A: Wrist side cover
•
B: Pulley (2 pcs)
•
C: Timing belt
Remove the motor with pulley.
10
Refitting motor axis 5
Use this procedure to refit motor axis 5.
Information
Action
Clean Room robots: clean the joints that
have been opened. See
1
Check that:
•
all assembly surfaces are clean and
without damages
•
the motor is clean and undamaged.
2
Place the motor in the wrist housing.
3
Reconnect connectors:
•
R2.MP5
•
R2.ME5
4
xx0900000611
Refit the
timing belt
on the
pulleys
.
5
Parts:
•
A: Wrist side cover
•
B: Pulley (2 pcs)
•
C: Timing belt
Continues on next page
214
Product manual - IRB 120
3HAC035728-001 Revision: N
© Copyright 2009-2017 ABB. All rights reserved.
4 Repair
4.7.5 Replacing motor axis 5
Continued
Содержание IRB 120
Страница 1: ...ROBOTICS Product manual IRB 120 ...
Страница 2: ...Trace back information Workspace R17 2 version a11 Checked in 2017 09 20 Skribenta version 5 1 011 ...
Страница 8: ...This page is intentionally left blank ...
Страница 90: ...This page is intentionally left blank ...
Страница 114: ...This page is intentionally left blank ...
Страница 224: ...This page is intentionally left blank ...
Страница 250: ...This page is intentionally left blank ...
Страница 254: ...This page is intentionally left blank ...
Страница 264: ...This page is intentionally left blank ...
Страница 270: ......
Страница 271: ......