34
Installation and maintenance guide
1ZSC000563-AAB EN, REV. 6, 2019-09-12
Procedure
1.
Connect the upper draw-rod (1) to the lower
draw-rod (4).
G004932
2.
Hold the pull-through cord (12) in tension, while
lowering the bushing onto the transformer.
CAUTION!
Do not damage the stud bolts. There is
a risk of metal falling into the
transformer.
NOTE!
Plastic sleeves put on two or three of
the stud bolts will help to guide the
flange, and will prevent damage to the
stud bolts.
G005100
3.
When installing the bushing at the transformer
factory:
1.
Make sure that the bushing is installed in the
correct orientation.
2.
Make permanent markings (16) on the
bushing flange and the transformer turret.
G005107
Содержание GSBK 170
Страница 1: ...1ZSC000563 AAB EN REV 6 2019 09 12 Transformer bushing type GSBK Installation and maintenance guide ...
Страница 46: ...46 Installation and maintenance guide 1ZSC000563 AAB EN REV 6 2019 09 12 ...
Страница 52: ...52 Installation and maintenance guide 1ZSC000563 AAB EN REV 6 2019 09 12 ...
Страница 54: ...54 Installation and maintenance guide 1ZSC000563 AAB EN REV 6 2019 09 12 ...
Страница 62: ...62 Installation and maintenance guide 1ZSC000563 AAB EN REV 6 2019 09 12 ...
Страница 66: ...66 Installation and maintenance guide 1ZSC000563 AAB EN REV 6 2019 09 12 ...
Страница 70: ......
Страница 71: ......