16
Installation and maintenance guide
1ZSC000563-AAB EN, REV. 6, 2019-09-12
Long term storage, more than 6 months
•
Use transport containers on both sides of the bushing, they have to be ordered separately.
Put drying agent in both transport containers.
•
The bushing can be stored outdoors, if it is in the transport box.
Keep the transport box protected from water, when the bushing is stored outdoors.
•
Keep the bushing dry, clean and protected against mechanical damage.
•
The bushing can be stored in both the vertical, and horizontal positions.
The bushing is delivered from ABB in a transport box, and the bushing is held in place by support blocks and
fiberboard in the box.
G006274
3.4 Lifting
3.4.1 Lifting the transport box
Overview
G004736
1
Center of gravity
2
Soft lifting slings
Содержание GSBK 170
Страница 1: ...1ZSC000563 AAB EN REV 6 2019 09 12 Transformer bushing type GSBK Installation and maintenance guide ...
Страница 46: ...46 Installation and maintenance guide 1ZSC000563 AAB EN REV 6 2019 09 12 ...
Страница 52: ...52 Installation and maintenance guide 1ZSC000563 AAB EN REV 6 2019 09 12 ...
Страница 54: ...54 Installation and maintenance guide 1ZSC000563 AAB EN REV 6 2019 09 12 ...
Страница 62: ...62 Installation and maintenance guide 1ZSC000563 AAB EN REV 6 2019 09 12 ...
Страница 66: ...66 Installation and maintenance guide 1ZSC000563 AAB EN REV 6 2019 09 12 ...
Страница 70: ......
Страница 71: ......